Our Work
A Selection of Signature Projects
Exterior Strip & Paint

Powerwashed, scraped, caulked and weatherproofed, board replacement, and 2 coats of paint on trim, body, fascia & soffit.
Walkway & Bed Install

Removed and replaced existing plantings with new design and new mulch, removed concrete walkway, prepped base, filled with compacted gravel, topped with leveled stone dust, pavers installed in straight herringbone pattern and gaps filled with permasand.
Paver Walkway & Landing

Removed existing concrete walkway, filled with compacted gravel, topped with leveled stone dust, pavers installed in straight herringbone pattern, filled gaps with permasand, installed a new 6’ step, veneered sides of landing and risers with natural stone veneer, and installed a granite treads and granite tiles on landing.
Rustic Oak Hardwood Install

Removed existing tile and hardwood floor, removed baseboards, cleaned subfloor, laid paper underlayment, installed 2 ¼” Prefinished Rustic Red Oak, reinstalled baseboards and caulked gaps and nail holes
Exterior Strip & Paint

Powerwashed, scraped, caulked and weatherproofed, board replacement, and 2 coats of paint on trim, body, fascia & soffit.
Walkway

Prepped base – installed and compacted gravel – laid and leveled 1″ of stone dust – installed pavers in straight herringbone pattern – filled joints with permasand
Wall Rebuild

Carefully removed existing retaining wall blocks and caps – dug-out existing base to 3′ – filled base with 3/4″ crushed stone – buried first row of wall block – installed french drain behind wall to prevent wall movement – rebuilt wall
Vinyl Fence Install

Cut back existing hedge line, Installed 6’ white vinyl fence with poles buried 3’ under ground and filled with concrete, and installed decorative rocks.
Retaining Wall Install

Removed existing wall, prepped 3’ base, filled base with ¾” crushed stone, buried first row of wall block below driveway level, installed French drain behind wall, built up wall and glued on cap.
Tile Floor Install

Removed existing engineered flooring, prep and level subfloor, lay tile with leveling system, grout and seal.
Select Maple Floor Install

Removed existing tile and carpet, removed baseboards, prepped subfloor, laid paper underlayment, installed 3 ¼” Prefinished Select grade Maple, reinstalled baseboards, caulked gaps and filled nail holes.
Interior Painting & Laminate Floor Install

Wiped down walls, caulk gaps, filled nail holes, painted ceilings, painted trim and walls with 2 coats, and installed new laminate floor in kitchen and living room.
Interior Painting & Hardwood Install
Removed carpet and baseboards – removed electrical plates – filled nail holes – caulked gap, where trim meets wall – painted ceiling, walls, and trim with 2 coats – painted baseboards, when detached from the walls – laid paper underlayment – installed prefinished 2 ¼” red oak, leaving ¼” gap on all walls – nailed floor every 6” with 2” staples – reinstalled baseboards – caulked gaps – filled nail holes – touched-up baseboards
Tile Floor Install
Removed existing tile that was laid over radiant heat system – removed step-up to breakfast bar – cleaned concrete subfloor thoroughly and carefully as to not damage heating system – installed new porcelain tile using leveling system to aid in levelness – grouted tile – sealed grout
Maple Hardwood Floor Install
Removed carpet and existing hardwood – installed and leveled new ¾” plywood subfloor – laid paper underlayment – installed prefinished 3 ¼” Select Maple, leaving ¼” gap on all walls nailing floor every 6” with 2” staples – installed new prefinished oak baseboards – filled nail holes with oak putty